Lime hemp plaster

Replastering bedroom walls with breathable lime plaster

Room stripped back to bare brickwork before lime plastering

Two external walls in this small bedroom were taken back to brick and replastered using lime plaster, with a breathable separation layer used to deal with an area of old soot contamination. 

A vertical band of soot contamination remained on the masonry where an old flue had once been. Removing it manually would have taken a considerable amount of effort with no certainty that all of the contamination could be removed.

Instead, I fixed woodwool board over the affected area to create a breathable separation layer before plastering.

Woodwool boards fixed over soot-contaminated masonry
Scratch coat of lime hemp plaster with a keyed surface ready for the next coat

The walls were built up with two coats of lime hemp plaster. The first coat was left with a key before a second coat was applied and ruled to bring the walls back into shape.

Once firm enough, the second coat was compacted and floated, leaving a suitable surface for the final lime putty finish.

Devil floating the lime hemp plaster to consolidate give a good key for the final coat of plaster.
Levelling the lime hemp plaster using a straightedge

The finish was applied in two coats and sponge floated as it began to firm up, before a final light pass with a steel trowel to leave a smooth finish while retaining some of the natural movement in the surface.

Sponge floating the fine lime putty top coat plaster

The completed lime plaster, still drying.

Completed lime plaster walls while still drying